KDK M48WG Operating And Installation Instructions page 6

Table of Contents

Advertisement

2
2
Take the Switch Lever and the Screw form the Part Set and screw them onto the Pipe as shown.
從零件組中取出開關杆和螺絲,然後如圖所示將之鎖緊至導管。
Pipe /
導管
Switch Lever /
開關杆
3
3
Insert Lower Canopy to the Pipe. Then insert Upper Canopy (with logo brand) to the Pipe.
將下罩蓋嵌入導管。然後將上罩蓋(印有品牌標誌)嵌入導管。
Lower Canopy /
下罩蓋
Pipe /
導管
Check Point After Installation / 安裝後的重點檢查
1. Insert the Lower and Upper Canopy to Pipe and the screw is not tightened. / 將下罩蓋和上罩蓋嵌入導管,並且螺絲沒被鎖緊。
2. Upper Canopy (with logo brand) is on top of Lower Canopy (no logo brand). / 上罩蓋 (印有品牌標誌) 是在下罩蓋 (無品牌標誌)的頂部 。
Assemble Pipe To Motor Assembly / 組裝導管至發動機組件
B)
1
1
Pull the power cord (from power supply) and insert into the Pipe hole as shown.
拉電纜(自電源)並如圖所示將之插入導管孔。
(i)
Safety Wire /
保險線
Screw / 螺絲
Upper Canopy (with logo brand) /
上罩蓋 (印有品牌標誌)
Power Cord (from power supply)
電纜(自電源)
(ii)
Ceiling /
天花板
Pipe /
導管
Upper Canopy /
上罩蓋
Lower Canopy /
下罩蓋
6
Do not screw Lower and Upper Canopy Screws /
切勿鎖緊下罩蓋和上罩蓋的螺絲
Check / 檢查

Advertisement

Table of Contents
loading

This manual is also suitable for:

M60wg

Table of Contents