Classe I, Division 2.) The most current English versions of all Liquid Controls publications are available on our web site, www.lcmeter.com. It is the responsibility of the local distributor to provide the most current version of LC manuals, instructions, and When in hazardous locations, turn power OFF before replacing or wiring modules.
10.2 to 27.2 VDC • ½″ NPT (5) Current 1 A maximum liquid Controls’ Grounding Kits • ¾″ NPT (2) To protect electronic components from ESD, all LectroCount truck intallations must include the installation of the Solenoid 2 Output LectroCount Ground Strap Kit (PN 82185) and the Epson Printer Ground Wire Kit (PN 82184). Properly grounded Temperature Rating 10.2 to 27.2 VDC...
MarKInGs dIMensIons ronT 4.72" 9.9" The equipment is Listed by UL to applicable US and Canadian standards for use in hazardous locations under Liquid Controls file E180172 Class I 10.7" Potentially Explosive Gas/Vapor Atmospheres 8.13" dIvIsIon 2 Gases and vapor are not normally present in an explosive concentration but may accidentally exist during abnormal operations 70°...
Smith positive displacement meters). This pulse output and off. The optical sensor and the solenoid valve are Capacity Strainer can also come from a Liquid Controls external POD connected to the LectroCount LCR 600 by separate data • Metrological data collection pulser or another pulse generator.
Pulse ouTPuT devICe Connect the LCR 600 and the printer to power supply. Page 29 The Liquid Controls Pulse Output Device (POD pulser) converts the rotary motion of a positive displacement Setup and calibrate the LCR 600. Refer to manual EM150-11.
leCTroCounT Ground sTraP KIT TyPICal adjusTable TruCK seaTs & Ground CheCK lectroCount Ground strap Kit Typical adjustable Truck seats All seat cushions are grounded in a similar manner. . esd Precaution . The illustrations on the next page detail the following aIr CushIon seaT - aIr CushIon seaT - Install the LectroCount Ground Strap Kit...
leCTroCounT lCr 600 MounTInG leCTroCounT lCr 600 MounTInG Mounting overview Mounting bolt Pattern Typically, the LectroCount LCR 600 is mounted directly The LectroCount LCR 600 base casting contains eight onto a flow meter; however, some fixed installations bolt holes in an industry standard bolt pattern. The holes require the register be mounted away from the meter.
lCr 600 MounTInG rouTInG lCr 600 daTa and PoWer Cables neptune Meters data and Power Cable The LCR 600 shipment typically includes a gray 40' remove existing registration equipment power cable and a 40' black data cable prewired to terminal blocks on the LCR 600 CPU board. On typical truck installations, the cables must be routed from the Depressurize the meter completely.
LCR 600 CPU board during installation. ETVC Kit ETVC Conduit Liquid Controls offers single stage and two stage To install the eTvC kit: electronic valves. Single stage valves have one solenoid Screw into the strainer cover Depressurize the meter completely.
18 AWG stranded wire (3 per solenoid). Not necessary for 3-Way solenoid valves. Only 2 needed for E-7 solenoids. TWo sTaGe valves A2848-11 The three most common Liquid Controls meter systems Solenoid-Operated • Weatherproof flexible conduit, ½" diameter and ½" NPT...
valves oPTICal aIr & vaPor elIMInaTors valve InsTallaTIon— optical air and vapor eliminator 110vaC To wire 110vaC solenoids to the lCr 600: Installations solenoIds In order for the LectroCount LCR 600 to control valves 1. Turn off all 100 VAC circuits before beginning the When ordered as part of a meter system with a LCR installation.
COUNTER J7 J7 Route the ∆P transducer cable through a cable gland in a amplifier from Liquid Controls Sponsler. For the LCR 600 port on the back of the LCR 600. Secure the cable gland. Disconnect Power to accept a single channel pulse, you will need version LC recommends running the cable through weatherproof conduit.
4 & 5 Printer Printer Installation (j1 rs-232) (lectroCount remote display) A Liquid Controls meter system with a LCR 600 typically Remote Display includes an Epson slip printer or roll printer. Installation Black Data Cable 40’ Auxiliary outputs 4 & 5 are typically used for the is the same for both printers.
Inspect the electrical equipment on the vehicle, and ensure it is properly installed and operating correctly. CPU board. □ Determine whether the vehicle is grounded positively or negatively. Consult Liquid Controls if the vehicle has a positive ground. J3 (RS-232) J2 (RS-485) □...
Page 16
PoWer InsTallaTIon PoWer InsTallaTIon Connect the Power epson Printer Power Connections All LCR 600 shipments typically include a 40' gray power cable (100', and 300' are also available) and a 5 A fuse. Page 17 describes the best practices for routing the gray power cable to the truck cab’s accessory panel. In-Line Fuse Chassis or Reliable Ground Black Data Cable...
PosT InsTallaTIon PosT InsTallaTIon—bIll of MaTerIals Weights & Measures seals IMPorTanT: before sealing the lCr 600 To detect possible intrusions into Weights & Measures approved calibrations on a LectroCount LCR 600, fillister holes have been drilled into the switchplate screw and the latch. To seal according to Weights & Measures standards, a wire After the LCR 600 is powered correctly, continue on to the LectroCount LCR 600 Setup and Operation manual to setup the LCR is threaded through the fillister holes and closed with a lead seal.
Page 18
bIll of MaTerIals bIll of MaTerIals bill of Materials—Internal Components 840405 CPu board 84057 Display Board Cable 81513040 81456 81833 81324 Data Cable J3–8-Pin Connector Hollow O-ring Seal J1–5-Pin Connector 08254 Ground Screw #8-32 x ¼" CTS RXD TXD RTS 485-B 485+A CTS RXD TXD RTS +VP...
Need help?
Do you have a question about the LectroCount LCR 600 E3708 Series and is the answer not in the manual?
Questions and answers