Leds; Connect Power; Laser Radiation - ADTRAN SDX 611 GPON SFU ONT Quick Start

Optical network unit or terminal
Hide thumbs Also See for SDX 611 GPON SFU ONT:

Advertisement

C
CAUTION!
LASER RADIATION - 1310 nm to 1600 nm
Do not view directly with optical instruments.
Use of controls or adjustments or performance of procedures other than
those specified herein may result in hazardous radiation exposure.
Fiber is installed in an SC/APC connector (OPTICAL) located on the rear
of the 611 GPON ONT (see
Figure 2
steps to install fiber.
1. Remove the Dust Cover from the SC/APC Connector.
2. Clean the end of the Incoming Fiber Connector.
3. Before installing the fiber, use an optical power meter to measure
the dB power. The level should not exceed –8 dB. Use an
appropriate bi-directional optical attenuator if the power levels are at
or above –8 dB. A level between –12 and –27 dBm is acceptable.
4. Connect the Incoming Fiber Connector.
Step 4: Connect Power
To connect power to the 611 GPON ONT, complete the following steps:
1. Plug the supplied 12 V AC/DC Power Adapter into the 12V 
connection on the rear of the 611 GPON ONT.
2. Connect the Power Adapter to a standard 100 - 240 V AC outlet.
3. Press the POWER button to turn the 611 GPON ONT on.
4. Verify power is on by checking the power LED on the 611 GPON
ONT. The LED should be green, indicating local power is on.
g
NOTE
ADTRAN recommends only using the DC power adapter that is
provided with the unit.
f
CAUTION!
For United States and Canada applications, the DC Power Adapter must
be an NRTL Listed LPS power supply. For 
International applications, the DC Power Adapter must be an LPS power
supply specifically approved for that country.
61287833F1-13C
on page 1). Complete the following
LED
S
When the 611 GPON ONT first powers up it performs self-tests. Once the
power up self-tests are complete, the status LEDs will reflect the state of
the hardware. The table below details the status indicated by the LEDs.
LED
Status
Power
Off
Green
Green Flashing
2
Optical
Green
2
Green Flashing
(Fast)
Green Flashing
2
(Slow)
Red
LAN
  
Off
Green
2
Green Flashing
Alarm/
Off
Update
Green
Green Flashing
2
Red
Indication
Power is off
Power is on, self-test passed,
normal operation
Unit is powering up
ONU ranged, authenticated, and 
configured with services
ONU is ranging and
synchronization process in
progress
ONU ranged and authenticated but not
configured with services
PON is down due to LOF/LOS
No Ethernet connectivity
Ethernet connectivity present,
no activity
Ethernet connectivity present, activity
detected
Interface operation state is up and 
packets Tx/Rx detected on the interface
No alarm detected
ONU software download 
complete and software upgrade in 
progress. ONU LED will turn off once
upgrade is successful
ONU software download in 
progress
ONU is powered up and PON 
operational state is up and ONU 
software upgrade failed.
New ONU software not operational due
to any of the following reasons:
Software image download failed
Software image flash write failed
Software image activation failed
Software image commit failed
3