WARNING!
!
Incorrect installation or removal of
meters can result in serious injury
WARNING
or death . Read the instructions in
this guide on the proper procedures carefully.
•
Any person installing, inspecting, or
maintaining a McCrometer flowmeter
should have a working understanding of
piping configurations and systems under
pressure.
•
Before adjusting or removing any meter,
be certain the system has depressurized
completely.
•
Be careful when lifting meters. Meters can
cause serious injury if lifted incorrectly or
dropped.
Electromagnetic Flow Meter
Quick Start Installation Guide
About This Quick Start Guide
This Quick Start Guide is a supplement to the
Installation, Operation and Maintenance manual
supplied with this meter. It is intended to be
a quick reference for the basic installation and
reading of the Dura Mag. For more detailed
information concerning the external connections,
external power, pulse output, or data logger,
please refer to the meter manual (30122-53 Dura
Mag IOM manual) or the data logger manual
(30121-87 McLogger IOM) downloadable from
www.mccrometer.com).
Grounding . . . . . . . . . . . . . . . . . . . . . . . 4
Operation . . . . . . . . . . . . . . . . . . . . . . . 6
Page 1
Battery Powered
30122-61, Rev. 1.3
30122-61 Rev. 1.3 | 11MAY2020
May 11, 2020
Need help?
Do you have a question about the Dura Mag and is the answer not in the manual?
Questions and answers