If temperature drops below or remains at the
freeze limit trip for 30 seconds, the controller
will shut the compressor down and enter into
a soft lockout condition. Both the status LED
and the Alarm contact will be active. The
LED will flash (five (5) times) the code
associated with this alarm condition.
Figure 4 - Freeze sensor location

Brownout protection

The UPM controller will constantly monitor
the power supply, if the nominal voltage
drops below 25% of its value.
approximately), the unit will enter brownout
protection
mode.
outputs will be de-energized and the unit will
enter the soft lockout mode.
The controller will not monitor the power
supply during the first 500 milliseconds of
compressor start up to avoid noise and false
alarms.
(18 VAC
The
compressor
Once the UPM detects a brownout condition
its fault LED will flash seven (7) times as
error code indication.

Condensation overflow

The UPM controller continuously monitors
the drain pan for high condensate water
level, and to do so it utilizes a sensor and
identifies an alarm condition when the
sensor's impedance drops below 230KΩ +/-
15 %. (ONLY when condensate sensor
option is present) Once the UPM senses this
resistance value it enters into a hard lockout
and reports the correspondent code via its
status LED (6 flashes).
To exit the hard lockout water has to return
to its normal level and UPM has to be reset
by removing the power from the Y terminal
(R if set on the DIP switch) the compressors
will be turned on after anti short cycle
expires.

Sequence of Operation

The UPM sequence of operation illustrated
CC
in the flow chart applies for both refrigerant
circuits.
energized 10 seconds after the first if both
Y1 and Y2 signals are applied at the
simultaneously.
The
second
compressor
is
8

Advertisement

Table of Contents
loading

Table of Contents