Optional
equipment
System diagram
Chapter 1 — Installation and Initial Setup
• maintenance kit
(Additional kits are available through GEI's Service Department)
• mixing/workspace plate
• desiccant cartridges (2)
• rubber stopper
• AC power cord
• RS-232 cable
• mating analog output connector
• transportation case
• CD-ROM containing this manual, HCON Humidity Conver-
sion software, and Prostep software
• temperature bath/circulator (for maintaining a stable cham-
ber temperature from 20°C to 30°C)
If an item is missing, contact GE General Eastern. Our phone
number and address are found on page 1.
Interconnection of the HumiLab's components is shown in
Figure 1.
5
Page
Need help?
Do you have a question about the HumiLab and is the answer not in the manual?