Sungrow T65 Commissioning Manual

Sungrow T65 Commissioning Manual

3-phase hybrid inverter

Advertisement

3-Phase Hybrid Inverter Commissioning Guide
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168
258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement
or advice on any of the Electrical or Solar Industry standards or guidelines. Please observe all OH&S
regulations when working on Sungrow equipment.
Version
Revision History
1.0
Issued for Approval
This document only applies to Sungrow 3-phase hybrid inverters (including SH5.0RT
and SH10RT). The information in this document may contain predictive statements
including, without limitation, statements regarding the future financial and operating
results, future product portfolio, new technology, etc. There are several factors that
could cause actual results and developments to differ materially from those expressed
or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Sungrow
Power may change the information at any time without notice.
GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0
As we continuously improving our services, changes to this document may occur without notice.
© Sungrow Australia Group Pty. Ltd. All rights reserved.
Created by
AU Service Team 23
Date
th
Nov 2020
Page 1 of 11

Advertisement

Table of Contents
loading

Summary of Contents for Sungrow T65

  • Page 1 3-Phase Hybrid Inverter Commissioning Guide Disclaimer The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement or advice on any of the Electrical or Solar Industry standards or guidelines.
  • Page 2: Table Of Contents

    2.6.2. WiFi dongle Connection ................7 Commissioning....................8 GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 2 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 3: System Wiring

    M.E.N. link. RCD’s must comply with AS/NZS3000. GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 3 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 4: Installation Steps

    Connect Backup AC in the same manner as the grid plug and click into the ‘Backup’ outlet. Backup Grid GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 4 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 5: Connect Pv Dc Connector

    Connect Energy Meter and battery Com cables to the multiplug. GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 5 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 6 Energy meter RS485 connection (T65 and DTSU666): T65: DTSU666: GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 6 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 7: Communications Connection

    2.6.2. WiFi dongle Connection Plug the dongle into the port. GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 7 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 8: Commissioning

    SG network. The dongle serial number is the password if required. GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 8 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 9 Logging in to the Inverter: Open the iSolarCloud App and use the local access feature. Log in as admin using WLAN (Please contact Sungrow for password). c) Set the county and grid code: Select the country, DNSP and grid type.
  • Page 10 “MORE” button bottom left. Continue by creating the iSolarCloud Plant. GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 10 of 11 © Sungrow Australia Group Pty. Ltd. All rights reserved. As we continuously improving our services, changes to this document may occur without notice.
  • Page 11 Local Firmware Upgrade via iSolarCloud Firmware Upgrade Tutorial If there is any issue, please contact Sungrow Service Department on 1800 786 476 or email to service@sungrowpower.com.au, Monday- Friday 9am - 5pm (AEDT). GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 11 of 11 ©...

This manual is also suitable for: