Installation Verification; Checklist; Boat Specific Settings - Simrad NAC-D Commissioning Manual

Table of Contents

Advertisement

5
28

Installation verification

When all units in the autopilot system are installed, external
equipment connected and the software configured according to
the previous chapters, the installation should be verified according
to the checklist. The boat specific settings should be noted down in
the relevant tables included this chapter.

Checklist

Description
Units mounted and secured
according to instructions
Network powered and
terminated according to
instructions
Sources selected
Vessel configured
Drive units configured and
calibrated
Compass calibrated
Seatrial completed (manual or
autotune)

Boat specific settings

Boat
Settings
Boat type
Boat length
Cruising speed
Transition speed
Installation verification
manual
Reference
Installation instructions for the
units
Wiring instructions for the units
Autopilot control unit
documentation
"Boat characteristics" on page 13
"Drive configuration" on page 14
"Compass setup" on page 16
"Sea trial" on page 16
| NAC™ -D Commissioning

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents