Hang The Opener - Chamberlain Series 1000E Owner's Manual

Chamberlain 1000e garage door openers: user guide
Table of Contents

Advertisement

Installation Step 3
Position the Opener
Follow instructions which apply to your door type as
illustrated.
SECTIONAL DOOR & 1-PIECE DOOR WITH TRACK
NOTE: A 25mm board is convenient for setting an
ideal door-to-T-rail distance. It is not necessary
when headroom is insufficient.
PROCEDURE: Raise the opener onto a stepladder.
Open garage door. Place a 25mm board on the top
section of door near centerline as shown. Rest T-rail
on 25mm board as shown.
T-rail
Door
If the top panel hits the trolley when you raise the
door, pull down the trolley release arm to
disconnect the inner and outer sections. The trolley
can remain disconnected until Step 9 is completed.
Installation Step 4

Hang the Opener

Two representative installations are shown. Yours may be different. Hanging brackets should be angled (Figure 1)
to provide rigid support. On finished ceilings (Figure 2) attach a sturdy metal bracket (not supplied) to structural supports
before installing opener.
PROCEDURE: Measure the distance from EACH side
of the opener to structural support.
Cut both pieces of the hanging bracket to required
lengths. Flatten one end of each bracket and bend or
twist to fit the fastening angles. Do not bend at the
brackets holes. Drill 5mm pilot holes in the structural
supports. Attach flattened ends of brackets to
suppports with 5/16"x1-7/8" lag screws.
Figure 1
Measure
Distance
5/16"-18x7/8" Screw
5/16" Lock Washer
5/16"-18 Nut
25mm
Board
Stepladder
Trolley
Structural
Supports
Lag Screws
5/16"x1-7/8"
13
TO
PREVENT
CAUTION
LIGHT-WEIGHT DOORS AND DOORS WITH
WINDOWS, DO NOT REST THE OPENER ON
THE DOOR.
1-PIECE DOOR WITHOUT TRACK
PROCEDURE: Measure the distance from floor to top of
door (in fully open position and parallel to the floor). Using a
stepladder as a support, raise opener to the same distance
from the floor (it will have a slight angle as shown).
The top of the door should be level with the top of
opener. For maximum efficiency, do not position opener
more than 5cm above this point.
Header
Bracket
Trolley
Release Arm
THE OPENER MUST BE SECURELY FASTENED
TO A STRUCTURAL SUPPORT OF THE GARAGE.
Lift opener and fasten to hanging bracket as shown.
Check to make sure T-rail is centered over door.
REMOVE 25MM BOARD. Operate door manually. If
door hits the rail, raise header bracket.
Bracket
(Not Supplied)
Lag Screws
5/16"x1-7/8"
DAMAGE
TO
ALL
Top of Opener
– FINISHED CEILING –
(Not Supplied)
5/16"-18x7/8" Screw
5/16" Lock Washer
5/16"-18 Nut
Figure 2
13mm Socket Wrench
WA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents