Download Print this page

Joy Sport CT-Economic Manual page 36

Advertisement

Available languages

Available languages

STEP:5
1)  Frist, distinguish between the left/right pedal support tube
       (note: check pedal 是upport tube with left/right label)
   2)  Set both pedal support tube (#71&#72) to the main frame
        as drawing shown first。
   3)  Insert long bushing (#79) to the axle on main frame (disc), then
        inset both pedal
        trube (#71&#72), insert short bushing (#80) washer (#1 7), secure each
        with M10 nylon lock nut (#12)  fully tighten up
   4)  cover the nut with end cap (#5)
STEP:6
1) Insert both pre‐assembled connecting tube (#83) to each of swivel
        Tube (#66 & #67)
    2)  locking up both with screws (#18) as drawing shown。
    3)  Finally, set end cap (#5 )cover the nut.
STEP:7
As photo shown
1) set the swing arm handle bar (#69 & #70) was insertd on the left L /Right R
    of the swing  arm handlebar .
2) turn the  handlebar on the aligned holes , secure both with two screws
     (#18) and lock.
3) Finally cover both nuts with end cap (#5)
STEP:8
   As photo shown
1) Fit the fixed handlebar (#68) with the screws (#6) and thru the bracket hold
     of upright tube with screw drive,
2) Set both EKG grip cables thru the small holes under the fie handlebar (#68)
    on the upright tube.
3) Pick up the cables from top of the upright tube.
4) Secure the fix handlebar covers with screws ( #59)
   Note! the cover (#84B) got a nut inject in the bar
PEDAL SUPPORT TUBE ASSY(一)
PEDAL SUPPORT TUBE ASSY(二)
UPPER SWING ARM HANDLE BAR
FIXED HANDLE BAR ASSY
NO
part list
QUANTITY
#5
2
#12
2
#17
2
#79
2
#80
2
NO
part list
QUANTITY
#18
4
#5
4
NO
part list
QUANTITY
#18
4
#5
2
NO
part list
QUANTITY
#6
2
#59
1
#84
1

Advertisement

loading