M18 Pump Reassembly Instructions

NOTE:
Review Section 5.1, General Reassembly before proceeding with M18 pump reassembly.
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
5.3.9
5.3.10 Install check valves (20 - 10 - 40), check valve (20 - 10 - 270), and orifice check
5.3.11 Install relief valve (20 - 10 - 30) onto manifold (20 - 10 - 10).
5.3.12 Install Polypak seal (20 - 20 - 10), rod bearing (20 - 20 - 30) and rod wiper
NOTE:
Refer to assembly drawing sheet 3 Detail A for correct orientation for Polypak lips.
M18 Reassembly Instructions
Install reservoir O-ring (10 - 100) over the lip of bottom end cap (10 - 40).
Install cylinder (10 - 20) over the lip of bottom end cap (10 - 40).
Install reservoir O-ring (10 - 100) over the lip of upper end cap (10 - 10) then install
entire upper end cap assembly (10 - 10) over the lubricated center bar assembly
(10 - 30) and into the cylinder (10 - 20).
Install thread seal (10 - 70) and countersink washer (10 - 60) onto center bar
assembly (10 - 30).
Install and tighten acorn nut (10 - 50) onto center bar assembly (10 - 30).
Apply sealant to breather (10 - 90) and install into upper end cap (10 - 10).
Apply sealant to pipe plug (10 - 80) and install into bottom end cap (10 - 40).
Install O-ring seals (20 - 20 - 40) into grooves on manifold (20 - 10 - 10).
Install control valve disc (20 - 10 - 290) on manifold (20 - 10 - 10) with flat head
screws (20 - 10 - 330).
Insert spring pin (20 - 10 - 340) onto rotor (20 - 10 - 300) and valve stem (20 - 10 - 280).
Install above assembly into manifold (20 - 10 - 10).
Place thrust bearing (20 - 10 - 370) and bearing washer (20 - 10 - 380) on the back
surface of the rotor (20 - 10 - 300) with the back of the rotor facing up.
Insert spring (20 - 10 - 390) and valve piston (20 - 10 - 310) into back
plate (20 - 10 - 320).
Slightly push above assembly into manifold (20 - 10 - 10) using manual press.
Install back brace (20 - 10 - 130) onto manifold (20 - 10 - 10).
Install ball (20 - 10 - 350) and spring (20 - 10 - 360) and pipe plug (20 - 10 - 210)
onto manifold (20 - 10 - 10).
valves (20 - 10 - 260) onto manifold (20 - 10 - 10).
(20 - 20 - 20) into the pump cylinder (20 - 10 - 20).