2.5 Installation of the Front Panel

2.5.1 Instalaltion Steps
As shown in the figure below, align the pipe outlet direction at the front panel to the pipe connector of
the unit. Then, do installation of the front panel as stated below.
(1) Temporarily place the front panel to the unit. In this case, put two buckles to the hookers in the opposite
direction of the air deflector motor at the front panel.
(2) Temporarily place the other two buckles to the hookers at the main unit.
(3) Tighten four screws under the buckles in about 15mm (the front panel will rise up.)
(4) As shown in the figure below, adjust the front panel to make it meet the ceiling perfectly.
(5) Tighten screws until thickness of stuffing material between the front panel and the unit goes within
5~8mm.
2.5.2 Precautions for Installation
(1) Incorrect tightness would lead to condition as shown in the figure below.
r
Swing flap moto
Unit
Ceiling
Air outlet
Air leak
Air leak
Buckle
Pipe outlet
Stuffing material
Decorative panel
Water drop
Water drop
9
Hooker
5~8mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents