Dc Inverter VRF plus Water Heater Solution Service Manual
Front panel body and installation
●
1.Take off the front panel from the panel body.
2. AS shown in Fig.4, install the panel body, and then tighten the screws according to the
sequences in the figures.
3 .As shown in Fig.5, install the panel on the panel ,and then turn it for fastening
6.4 Wall mounted type
6.4.1 Dimensions Data
Remark :The appearance will be different according to the models.
Model
GMV(L)-R22G/NaB-K
A(mm)
770
B(mm)
250
C(mm)
190
Model
GMV(L)-R50G/NaB-K
A(mm)
1020
B(mm)
C(mm)
6.4.2Installation space requirements
Schematic diagram of installation spaces
GMV(L)-R28G/NaB-K
770
250
190
GMV(L)-R56G/NaB-K
310
228
A
GMV(L)-R36G/NaB-K
830
285
189
GMV(L)-R71G/Na-K
1020
310
228
INSTALLATION
C
GMV(L)-R45G/NaB-K
GMV(L)-R80G/Na-K
1178
326
227
830
285
189
1178
326
227
159