(2) Put the hoisting stand to the hanger bolt. Nuts and washers should be used at both the lower and
upper ends of the hoisting stand so as to secure the locating board and prevent the washers from
falling out.
(3) The sizing of the ceiling opening depends on the template cardboard. The center of the ceiling opening
is labeled at the template cardboard. Use three screws to fix the template cardboard to the unit and
also use other screws to fix the corners of the drain channel.
(4) Adjust the unit rightly to the installation location.
(5) See if the unit is horizontal or not by checking the four corners one by one with a water level. The drain
pump and float valve are built inside the unit. When the unit is inclined towards the opposite direction
of the condensate flow, the float switch may fail to work normally and even lead to water drops.
(6) Remove the locating plate for the washer and tighten the screw above it.
(7) Remove the cardboard template.
(tighten the hoisting hanger)
Water level
Anchor bolt
Screw (supplied on site)
Washer (attached)
Hoisting hanger
Tighten two screws
Center of the ceiling
opening
PVC pipe
Screw (attached)
Insert
Locating plate
(tighten the washer)
Fix one corner of the drain channel with the screw.
Template cardboard (attached)
Screw (attached)
(Tighten the template cardboard)