Commissioning - JUMO 404304 Operating Instructions Manual

Pressure and differential pressure transmitters
Hide thumbs Also See for 404304:
Table of Contents

Advertisement

Available languages

Available languages

After
connecting the
supply voltage
The output signal can be measured after the supply voltage has been con-
nected.
For gauge pressure measurement, connect the pressure to be
measured to the "+" input. The other pressure connection remains
open.
The warm-up time for the instrument is 1hour.
After this time (at a constant ambient temperature), the output sig-
nal with differential pressure measurement must have stabilized at
zero.
With short ranges, the mounting position can cause a zero shift.
This shift can be compensated after the warm-up time by using
the potentiometer TP1 (zero).

6 Commissioning

13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

404304/000-414-406-02-298

Table of Contents