Electric Connection; Start Up; Maintenance; Waste Management - S&P CACB-HP 12 Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

4.

ELECTRIC CONNECTION

The electric connection must be made by a qualified person.
The motor will be supplied only in 230 V / 50 Hz single-phase power (see the data label glued to the box).
The electric power supply must conform to NFC 15-100.
Do not forget to connect the earth.
An optional partial vacuum switch can be installed in the factory.
The motor is equipped with a PTO. Its connection is made on separate conductors.
Warning : it is prohibited to connect the PTO for a 400°C ½H C4 installation.
The motor connection must conform to the electric schematic diagram glued to the box.
Electric schematic diagrams :
3-speed, single-phase motorised fan, which allows adapting the air performances to the installation.
Electric schematic diagrams of the CACB-HPs below :
M
Green
~
Green
1
2
3
LS HS
230V~
Ph
N
CACB-HP without
mounted electric
accessory
5.

START UP

Make sure that the assembly rotates freely (fan wheel) and that no object is liable to be ejected by the turbine.
Before getting started, the box must be connected to the network and the cover must be closed.
Make sure that the current absorbed by the motor is not more than 5% above the current indicated (see data
label).
6.

MAINTENANCE

Cut off the electric power supply before any intervention and make sure that it cannot be switched on again
during the intervention consign (by locking).
Remove dust from the fan wheel blades.
7.

WASTE MANAGEMENT

7.1 Treatment of Packaging and General Industrial Waste (GIW)

The packaging (unconsigned pallets, cartons, films, wooden boxes) and other GIW must be made reusable by
an approved service provider. It is strictly prohibited to burn, bury or dump them in nature.

7.2 Treatment of Professional WEEE

This product must not be dumped or treated with household refuse, but must be deposited in an appropriate
collection point for waste electrical and electronic equipment (WEEE).
ENGLISH
TOP
1
2
TOP
N
LS
230 V~
50 Hz
CACB-HP with Switch
remounted
M
2
2
~
4
4
6
6
8
8
3
5
7
4
6
8
HS
Ph
13 / 20
230V
Ph
N
50Hz
HS
TOP
2 speed
motor
CACB-HP with circuit breaker
mounted
NT_518737_CACB-HP_ES-AN-FR_130515.docx
LS

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cacb-hp 20Cacb-hp 30

Table of Contents