Installation - Omron E5CK-T Manual

Ramp/soak process controller
Hide thumbs Also See for E5CK-T:
Table of Contents

Advertisement

E5CK-T

Installation

J INSTALLATION
Main Parts
Termi-
nals
Output Board
Input type
connector
Option Board
Removing Internal Mechanism
While pressing the hooks on the left and right sides of the front
panel, carefully pull the internal mechanism from the housing.
(Refer to the drawing below.)
Housing
Front panel
J SETTING UP THE OUTPUT BOARD
1. Two rectangular holes are provided on the power board (right
side of Controller). Fit the two protrusions of the output board
into these two holes.
2. With the output board fitted into the power board, fit the out-
put board into the connector on the control board (left side of
Controller).
1
2
J SETTING UP THE OPERATION BOARD
E5CK-T
1
2
175

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents