EXPro User Manual
Quarterly Test (to be carried out by authorised service personnel only)
Check that any servicing or repairs required by all previous logbook entries has been
•
undertaken.
Visual inspection of the batteries and connections. Check the alarm sounders work on battery
•
only.
Activate a device from each zone to test the fire alarm. (As per weekly test).
•
Annual Test (to be carried out by authorised service personnel only)
Check every detector, call point, sounder and all auxiliary equipment for correct operation.
•
Check Cage output Voltage (29.5VDC), Charger Voltage (27.6Vnormal) & Battery Voltage (25-
•
27V)
Every Five Years (to be carried out by authorised service personnel only)
Carry out a complete wiring check in accordance with the testing and inspection requirements
•
of the relevant National wiring regulations (in the UK this is the IEE Wiring Regulations). The
Batteries should be replaced because SLA batteries have a working life of 5 years.
INDICATIONS & CONTROLS
INDICATIONS
Here is the fascia for the Premier EXPRO panel.
Figure 1. EXPro fascia layout
Approved Document No: GLT-212-7-2
Issue: 1.1 Author: NRPJ Date: 14/07/2014
Page 5