General Wiring Fs20/Fs920 - Siemens FN2012-A1 Installation Manual

Hide thumbs Also See for FN2012-A1:
Table of Contents

Advertisement

Wiring
4

General wiring FS20/FS920

Connector/Designation
FCA2031
X
Panel
4.2 General wiring FS20/FS920
14 | 32
Description
Connection module (MoNet) in the slot on the SAFEDLINK main module. Makes the
MoNet bus available.
Not used
Approved Siemens panel in which the Ethernet switch (modular) is being installed
The electrical Ethernet cable for connections P2...P5, as well as the connections via
the Ethernet module (electric) VN2001 to connections P0 and P1 must be at least
6 ft/2 m long.
External Ethernet connections P2 and P3 are limited to the same room and have a
maximum length of 20 ft/6 m.
The internal Ethernet connections P4 and P5 are limited to the same housing.
Figure 8: View of cable routing
Supply and battery connection
The wiring must be routed as far away as possible from the installed components and
the non-current-limited cables and fixed in place appropriately.
Cable guides in the housing
Current-limited and non-current-limited cables must not be routed together through the
same cable entry.
A6V10407862_e_en_--

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents