START HERE
Read this before you proceed
This is a brief overview of what is involved in installing a new flow meter or retrofitting an existing flow
meter with a FlowConnect unit. All of the steps listed below are described in full detail the IOM manual.
Before you begin, read this sheet carefully.
1
Prepare for installation
•
Read the user documentation required for
installation or retrofit. You will find a flow
meter manual and a FlowConnect manual
specific for the product you received.
•
Perform an inventory of the parts using the
parts list in the IOM manual.
•
Assemble the tools you will need.
•
Prepare the site if necessary. Plan where to
install the flow meter, sensors and solar panel.
3
Activate the FlowConnect unit
After the FlowConnect is installed, you will need to attach the antenna, connect the batteries, and attach the
tamper evident seal.
Activation steps:
1. Attach the antenna.
2. Remove the battery cover
hex driver.
CONTINUED ON NEXT PAGE
2
Install the new flow meter or perfrom the
retrofit as described in the IOM manual.
1
with a 5/32"
Install the flow meter or
perform the retrofit
2
30122-22 Rev. 1.1 | 05DEC2019