Mercia Garden Products 01DDPENT1006-V3 General Instructions Manual

Mercia Garden Products 01DDPENT1006-V3 General Instructions Manual

Advertisement

Quick Links

General Instructions
10x6, 12x6 & 14x6 Double door pressure treated pent sheds
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy or
extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment
to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions,
The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap
the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding
ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01DDPENT1006-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DDPENT1006-V3

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 01DDPENT1006-V3, 01DDPENT1206-V3, 01DDPENT1406-V3 Please retain product label and instructions for future reference 10x6 Overall Dimensions: 12x6 Overall Dimensions: 14x6 Overall Dimensions: Length = 3116mm Length = 3662mm Length = 4288mm Strip - 12x56x2144mm QTY 7 - Width = 1816mm Width = 1816mm...
  • Page 3 Please retain product label and instructions for future reference Step 3: Window side assembly Pre Assembly Cut 7x (No. 10) strips to 515mm and secure 4x Before assembling remove the transportation strips to the inside of the window gap blocks from the bottom of each panel. using 2x20mm screws per strip.
  • Page 4 Please retain product label and instructions for future reference Step 7 Step 5 *If you have purchased the T&G oor and Following the same method outlined roof option please continue to step 8 in step 4, place the next 2 panels onto Place a roof support bar (No.
  • Page 5 Please retain product label and instructions for future reference Step 9 Step 11 Place the assembled roof panels Cut the felt into 2 sheets and lay on to the building and secure as onto the roof. shown in the illustration with 18x30mm screws * Ensure there is approximately 50mm of overhang around the...
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 13 Measure the gaps at the corners of the building & cut 6x (No. 9) strips to match. Once cut secure to the building using 3x30mm screws per strip.
  • Page 7 Please retain product label and instructions for future reference...

This manual is also suitable for:

01ddpent1206-v301ddpent1406-v3

Table of Contents