Mercia Garden Products 01PTOSBA0305SDNW-V1 General Instructions Manual

3x5 pressure treated apex shed: single door no window

Advertisement

Quick Links

General Instructions
01PTOSBA0305SDNW-V1
3X5 Pressure Treated Apex Shed: Single Door No Window
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also
occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended
periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guaran-
tee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of
childrens products independently tested to EN71 level, we cannot accept responsibility for your safety
whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01PTOSBA0305SDNW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01PTOSBA0305SDNW-V1

  • Page 1 25mm above the surrounding ground level to avoid ooding. TYPES OF BASE For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. Mercia Garden Products Limited, - Slabs laid on 50mm of sharp sand. Sutton On Trent, Newark,...
  • Page 2 01PTOSBA0305SDNW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 1593mm Depth = 859mm Cover Trim QTY4 Height = 1918mm S1245-1560MM Base Dimensions: Width = 1460mm Depth = 795mm Facia QTY4 S1260-851MM Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Step 2 Pre Assembly Place the oor (No.4) on a rm and level base. Ensure the base has Remove transportation blocks from suitable drainage free from areas the bottom of each panel before where water can collect.
  • Page 4 Please retain product label and instructions for future reference Step 6 Step 4 Fix both eaves frame (No.9) to the Place the plain gable (No.3) edge of both roof panels (No.5) and the assembled door taking care to attach the eaves gable (No.1) on to the oor frames to the edge of the roof panel and x the corners together...
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 9 Cut the felt (No. 15) into one sheet Fit the cover trims (No.7) over the and lay onto the roof as shown in corners and secure in place using the illustration.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 11 Fit the turn buttons (No.13) to the door gable in such a way that the door can be securely held in place. *It is important to t these turn buttons as they help to ensure that the door stays in place rather than...

Table of Contents