ANY QUESTIONS? Scan the QR code to contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel. T Hinge QTY 4 L-Bracket QTY 2 PI-02-1043 Take care removing the blocks as to not damage the panels. Tap with a at headed PI-07-0012 screwdriver and hammer. Dispose of the blocks once removed.
Page 6
Step 2 IMPORTANT: Pre-drill before xing screws. Before assembly, please make sure you have a suitable Parts needed - No. 5 QTY 2 base ready to install your building onto. Place the oors (No. 5) on a rm and level Step 1 base, ensure the base has suitable IMPORTANT: Pre-drill before xing screws.
Page 7
Step 3 Step 5 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 2 QTY 1 Parts needed - No. 1 QTY 1 No. 3 (or 4) QTY 1 No. 4 (or 3) QTY 1 **Please note: Whether you have purchased Position the remaining Window Panel (No.
Page 8
Step 7 Step 8 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 6 QTY 4 Place the assembled ridge bar in No. 13 QTY 4 between the Gables (No. 1 & 2) in line with the central uprights within Fix the eaves frames (No.
Page 9
Step 9 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 2 Parts needed - No. 16 QTY 2 Position a Truss Frame (No. 14), centrally Place a Truss Block (No. 16) directly below underneath the join of the two roof sheets the Truss Frame (No.
Page 10
Step 11 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 15 QTY 1 Once the roof is secured, Place the Truss Support Brace (No. 15) x the panels to the oor using underneath the two Truss Frames (No.
Page 11
Step 14 Step 15 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 23 QTY 1 For a windowless version go to step 16 Parts needed - No. 9 QTY 10 Cut the felt (No. 23) into three sheets No. 21 QTY 2 measuring: 3050mm (L) x 1000mm (W).
Page 12
Step 16 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 10 QTY 6 Parts needed - No. 18 QTY 2 Locate the Cover Trims (No. 10) over Attach the Inner Door Blocks (No. 18) to the each panel join and corner of the framing inside one of the doors (No.
Page 13
Step 20 Step 21 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 17 QTY 2 No. 26 QTY 1 Once constructed, apply a preserving treatment and a waterproo ng treatment Fix the door strips (No. 17) onto to your garden building as soon as the front of the doors (opposite possible.
Page 14
ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 01DTOVAX1006DDFW-V2 and is the answer not in the manual?
Questions and answers