Summary of Contents for Mercia Garden Products 01DTPRMSHPN0804SDOW-V2
Page 1
MADE IN GREAT BRITAIN 2mm Drill bit Water proof Preservative...
Page 2
ANY QUESTIONS? Scan the QR code to contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
Building Content: 01DTPRMSHPN0804SDOW-V2 Overall Dimensions: Base Dimensions: Tip: Labelling your parts, using a pencil and masking tape, may help you Width = 2550mm Width = 2442mm to identify them easier when you need them. Depth = 1322mm Depth = 1175mm...
Page 5
End View Pre Assembly Large Cover Trim - 12x55x2025mm QTY 3 Before assembling remove the transportation blocks from the bottom of each panel. S1255-2025mm End View Take care removing the blocks as to not damage the panels. Tap with a at headed screwdriver and hammer.
Page 6
This shed can also be constructed with the 8x4 Before assembly, please make sure you have a suitable Lean-To greenhouse (04DTPREMPN0804HGS-V1) base ready to install your building onto. to create the 8x8 Combi. See from page 13 for assembly instructions. Step 1 IMPORTANT: Pre-drill before xing screws.
Page 7
Step 2 IMPORTANT: Pre-drill before xing screws. Step 4 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 1 Parts needed - No. 1 QTY 1 (or QTY 2) No. 15 QTY 3 No. 2 QTY 1 (or QTY 2) (Or No.3 QTY 1) Place the Floors (No.
Page 8
Step 6 IMPORTANT: Pre-drill before xing screws. Step 8 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 Parts needed - No. 8 QTY 2 No. 3 QTY 1 (Or No.2 QTY 1) Locate the two Panel Tops (No. 8) next to each other as shown, ensuring they are ush and Place the Plain Panel (No.
Page 9
Step 10 IMPORTANT: Pre-drill before xing screws. Step 11 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 5 QTY 2 Fix the Roofs (No. 5) to the top of the Locate the Roof Panels (No. 5) on top of building, ensuring the side edges are the building, ensuring that the roof ush with the building and the roof is...
Page 10
Step 13 IMPORTANT: Pre-drill before xing screws. Step 14 Parts needed - No. 10 QTY 2 Parts needed - No. 17 QTY 1 No. 16 QTY 2 No. 21 QTY 4 Cut the felt (No.17) into two sheets measuring: Place the Window Strip (No. 16) 11mm 2646mm (L) x 1000mm (W).
Page 11
Step 15 IMPORTANT: Pre-drill before xing screws. Step 17 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 22 QTY 2 Parts needed - No. 12 QTY 3 Fix the casement stay (No. 22) to the Locate the Small Cover Trims (No. 12) window and then align the xings to over the panel joins on the lower side the window panel framing.
Page 12
Step 19 IMPORTANT: Pre-drill before xing screws. Step 20 Parts needed - No. 13 QTY 2 No. 14 QTY 4 Once constructed, apply a preserving treatment and a waterproo ng treatment Locate the Large Fascias (No. 13) onto to your garden building as soon as either side of the roof, as shown.
Page 13
Pre drill holes from the shed Requires: Panel Top (No. 8) straight into 8x4 Premium Pent Shed & 8x4 Premium Lean-To Greenhouse the Greenhouse roof panel. 01DTPRMSHPN0804SDOW-V2 & 04DTPREMPN0804HGS-V1 Secure in place using 4x70mm Length - 2550mm Width - 2368mm screws, as shown.
Page 14
Step 23 IMPORTANT: Pre-drill before xing screws. Step 24 Parts needed - No. 11 QTY 1 Once constructed, apply a preserving Use a tape measure to measure the treatment and a waterproo ng treatment height of the joining panels on the to your garden buildings as soon as back of the shed / inside the possible.
Page 15
ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 01DTPRMSHPN0804SDOW-V2 and is the answer not in the manual?
Questions and answers