Chamberlain HDSW24UL Installation Manual page 23

Commercial dc vehicular swing gate operator
Hide thumbs Also See for HDSW24UL:
Table of Contents

Advertisement

Wired setup
Before digging, contact local underground utility locating companies. Use
PVC conduit to prevent damage to cables.
1. Disconnect ALL power to the operator and turn OFF the battery and
AC power switches.
2. Trench across driveway to bury the shielded twisted pair cable.
3. Connect the wires from the shielded twisted pair cable to the Com Link
terminals on the primary gate operator control board. NOTE: We
recommend that all accessories and board configurations are set on
the primary operator.
4. Route the shielded twisted pair cable to the secondary gate operator's
control board.
5. Connect the wires from the shielded twisted pair cable to the Com Link
terminals on the secondary control board (Com Link A to Com Link A
and Com Link B to Com Link B). Ground the shield of the cable to the
chassis ground of one operator.
6. Connect ALL power to the operator and turn ON the battery and AC
power switches.
Bipart delay/synchronized close
The BIPART DELAY switch is used only with dual gate applications and serves two functions:
• BIPART DELAY
The BIPART DELAY is used in applications where a maglock, solenoid lock, or decorative overlay would require one gate to close before the other. The
operator with the BIPART DELAY switch ON will delay from the close limit when opening and be the first to close from the open limit.
• SYNCHRONIZED CLOSE
To synchronize the closing of the gates, set the BIPART DELAY switch to ON for both operators.
INSTALLATION
Com Link Data A
Com Link Data B
DUAL GATE WIRE TYPE (SHIELDED TWISTED PAIR CABLE)
22AWG up to 200 feet (61 m)
Wire must be rated at 30 Volt minimum
23
18AWG - 200-1000 feet (61-305 m)
Com Link Data A
Com Link Data B

Advertisement

Table of Contents
loading

Table of Contents