Alpha ESS SMILE-S6-HV Installation Manual page 25

Energy storage system (ess)
Hide thumbs Also See for SMILE-S6-HV:
Table of Contents

Advertisement

zz
Mounting Angle and Stack Requirement
SMILE-BAT-8.2PH should be floor-mounted.
SMILE-S6-HV-INV should be wall-mounted.
The installation angle requirement is as follow:
Do not mount the battery pack and inverter at forward tilted, back tilted, side tilted,
horizontal, or upside down positions.
Mounting Space Requirements
Reserve sufficient clearance around the battery pack and inverter to ensure
sufficient space for installation, maintenance and heat dissipation.
___________________________________________________________________
Alpha ESS Co., Ltd.
Your Smart Energy
Page 25 of 75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile-s5-hv

Table of Contents