Unpacking; Checking The Outer Packing; Scope Of Delivery - Alpha ESS SMILE-S6-HV Installation Manual

Energy storage system (ess)
Hide thumbs Also See for SMILE-S6-HV:
Table of Contents

Advertisement

Your Smart Energy

5. Unpacking

5.1
Check the Outer Packing
Before unpacking the battery pack and inverter, check the outer packing for damage,
such as holes and cracks. If any damage is found, do not unpack the product and
contact your dealer as soon as possible.
5.2

Scope of Delivery

Check the scope of delivery for completeness and any externally visible damage.
Contact your distributor if the scope of delivery is incomplete or damaged.
Inverter
(X1)
PV+&PV-
Connectors
(X2)
Ring Terminal
Lug (X4)
Installation
Manual (X1)
___________________________________________________________________
Page 22 of 75
SMILE-S6-HV-INV Hybrid Inverter
Upper Wall
Bracket (X1)
Cord End Terminal
(X8)
Screw M5*10 (X4)
Screw M6*16 (X2)
Magnet Ring (X1)
Alpha ESS Co., Ltd.
Lower Wall
Bracket (X1)
Paper Plate (X1)
10 Pin Terminal
WiFi Module (X1)
Block (X1)
T20 Screwdriver
(X1)
PC Gasket (X1)
Inverter
Wall Anchor
Positioning
ST6*55 (X6)
(Optional)
Indoor Use
Outdoor Use
Terminal
Resistor (X1)
CT (X1)
Grid-CT Cable
(Optional)
(X1) (Optional)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile-s5-hv

Table of Contents