Page 1
Solax Power Network Technology(Zhe jiang) Co,. Ltd. Copyright Declaration The copyright of this manual belongs to Solax Power Network Technology(Zhe jiang) Co,. Ltd. (SolaX Power Co.,Ltd.). Any corporation or individual should not plagiarize, partitially or fully copy (including software,etc.), and no reproduction or distribution of it in any form or by any means. All rights reserved.
Scope of Validity 4.5.1 CONNECTING POWER CABLES BETWEEN BATTERY PACKS ....This manual is an integral part of T-BAT Series. It describes the assembly, 4.5.2 CONNECTING POWER CABLES TO INVERTER ............ installation, commissioning, maintenance and failure of the product. Please read 4.5.3 CONNECTING CAN COMMUNICATION CABLE..........
Storage Temperature: -20~+55℃ · Risks of re SolaX Power Network Technology (Zhejiang) Co., Ltd – Do not expose the battery to temperatures in excess of 55°C. ADD: No.288 Shizhu Road, Tonglu Economic Development Zone, Dongxing District, Tonglu City, Zhejiang Province, China.
Response to Emergency Situations Symbol Explanation 2.2.1 Leaking Batteries If the battery leaks electrolyte which is corrosive, avoid contact with the leaking liquid or gas. Direct contact may lead to skin irritation or chemical burns. If one is exposed to the leaked substance, do these actions: TUV mark for IEC62619 Accidental inhalation of harmful substances:Evacuate people from the contaminated area, and seek medical attention immediately.
3. Product Introduction Quali ed nstaller Product Introduction Product Overview WARNING! 3.1.1 Demension and Weight A battery management system (BMS) is an electronic system that manages a All operations of T-BAT SYS-HV relating to electrical connection and rechargeable battery. installation must be carried out by quali ed personn . Battery is a type of electrical battery which can be charged, discharged into a load.
3. Product Introduction 3. Product Introduction Basic Features Speci cations 3.2.1 Features 3.3.1 T-BAT SYS-HV Con guration List The T-BAT SYS-HV is one of the advanced energy storage systems on the market Model Battery Pack Energy(kWh) Voltage (V) today, incorporating state-of-the-art technology, high reliability, and convenient control features shown as below: T-BAT H 5.8 T-BAT H 5.8*1...
4. Installation 4. Installation Installation Tools These tools are required to install the T-BAT system. Installation Prerequisites Make sure that the installation location meets the following conditions: The building is designed with resistance to earthquakes Ÿ The location is far away from the sea, to avoid sea water and humid air Ÿ...
4. Installation 4. Installation 4.4.3 Accessories HV11550: T-BAT H 5.8: The table below lists the number of each component. The table below lists the number of each component. Object Description Quantity Power cable between inverter and T-BAT H 5.8 (+) (2m) Object Description Quantity...
4. Installation 4. Installation 4.4.4 Battery Installation Steps It is recommended that the space between battery packs is more than 300mm. Steps (for T-BAT H 5.8 or HV11550): Make sure the wall is strong enough to withstand the weight of battery. Step 1: Fix the wall brakcet (H or G1) on the wall ·...
4. Installation 4. Installation Cable Connection For T-BAT H 5.8 + 1~3 battery packs: 1. Connect “-” ( for T-BAT H 5.8 or for HV11550) on the right side VI’ 4.5.1 Connecting Power Cables between Battery Packs to “+” ( ) on the left side of the next battery pack. II’...
4. Installation 4. Installation 4.5.2 Connecting Power Cables to Inverter Ø Connecting Charging Cables between Inverter and T-BAT System: 1. Connect the the positive cable (+) (A) and negative cable (-) (B) to the This step is going to connect power cables between inverter and T-BAT system. BAT+ and BAT- respectively as shown in the following gu .
Page 14
4. Installation 4. Installation Ø Disassembling Power cable (on BAT+, BAT-, “+”, XPLUG port) Disassembling Power Cable (on ”-”, YPLUG port) Ø Disassemble the power cable by plugging the slot type screwdriver or the Power Disassemble the power line by plugging the Power cable disassembling tool(L) cable disassemble tool(L) to the terminal groove of the power cable.
4. Installation 4. Installation 4.5.3 Connecting CAN Communication Cable 4.5.4 Connecting RS485 Communication Cable It is required for the BMS to communicate with the inverter for proper operation. For T-BAT H 5.8: There's no need to use RS485 communicaton cable. 1.
4. Installation 4. Installation 4.5.5 Connecting Ground Wire 4.5.6 Overall Installation It is recommended to protect the cables with corrugated pipe. The terminal point for GND connection is on the side of grooves as shown below: For T-BAT H 5.8: Cable size: 10AWG.
4. Installation 4. Installation For T-BAT H 5.8 + 1~3 battery packs: Overview of Installation The following diagram is a completed T-BAT system installation with T-BAT H 5.8 1. Connect the cables at one end of the T-BAT H 5.8/HV11550. + three battery packs.
5. Commissioning 5. Commissioning Commissioning Commissioning Con guing Batery System The DIP switch is used to con gue the number of battey packs which are communicating to inverter. The detailed con guration inomation is shown as follows: NOTE! When powering on the BMS, the system will start self-testing. If the buzzer bips, it means DIP con guration fault or communication failue occurs.
5. Commissioning 5. Commissioning Commissioning Steps Status Indicators The LED indicators on the front panel of the battery pack are showing the If all the battery packs are installed, follow these steps to put it in operation. operating status. 1. Remove the upper cover board of T-BAT H 5.8; 2.
6. Troubleshooting 5. Commissioning 5.3.2 Battery Pack Troubleshooting Troubleshooting Check the indicators on the front to determine the state of the T-BAT system. A warning state is triggered by a condition, for example, when voltage or temperature is beyond the designed limitations. The T-BAT system's BMS periodically reports its operating state to the inverter.
Page 21
6. Troubleshooting 6. Troubleshooting Warning Messages Description Troubleshooting Warning Messages Description Troubleshooting Wait till the temperature of cells go BMS_CellTempDiff_Fault The temperature Stop charging or discharging for a Battery over BMS_TemHigh temperature back to the normal state. between cells are while.
7. Decommissioning 7. Decommissioning Decommissioning Maintenance and Warranty Maintenance Dismantling the Battery Shutting down T-BAT system If the ambient temperature for storage is -20~55°C, recharge the batteries Disconnect the cables between BMS and inverter at least one time every 3 months. Disconnect the short-circuit plug on the last battery module If the ambient temperature for storage is -20~20°C, recharge the batteries Disconnect the cables.
Need help?
Do you have a question about the T-BAT Series and is the answer not in the manual?
Questions and answers