Commissioning (Installers Only) - Bosch FB 100 Installation And Operating Instructions Manual

Remote control and room sensor for fw 200 on a boiler with heatronic 3
Hide thumbs Also See for FB 100:
Table of Contents

Advertisement

US/CA
4

Commissioning (installers only)

B Specify heating circuit number for the coding
of the FB 100 and IPM 2.
– For a heating system with FW 200 a
heating circuit from HC
associated coding 1, 2, 3 or 4 is allowed.
B Set the DIP switch on the IPM 2 according to
the assigned heating circuit.
B Switch on the system.
Description of the controls
page 2.
During first commissioning or after a global reset
(resetting all adjustments):
B Turn
to select the language and press
to confirm.
B Only one FB 100 can be assigned per heating
circuit and per code. Select ID heating circuit
with
and confirm with
B On commissioning, the automatic system
configuration is started (wait 60 seconds and
follow the instructions shown).
B Set time and date for the FB 100 on the
outdoor reset controls.
B Adjust other settings to suit the specifics of
the system,
Section 6 starting on page 23
and Section 8 starting on page 32.
to HC
with
1
4
.
Commissioning (installers only) | 15
6 720 643 259 (2010/05)

Advertisement

Table of Contents
loading

Table of Contents