Installation Guide; Inspecting Shipment; Unpacking; Leveling - Challenge SCM Instructions And Parts Manual

Single cornering machine
Hide thumbs Also See for SCM:
Table of Contents

Advertisement

6.0 Installation Guide

6.0 Installation Guide

6.1 Inspecting Shipment

The cornering machine has been carefully packed to prevent damage during shipment. However,
claims for damage or loss are the responsibility of the recipient. Inspect all shipments as soon as
they are received. If there is any noticeable damage, note it on the freight bill. Visual and/or hidden
damage must be reported to the claims department of the carrier within 15 days. Contact your dealer
if you need any assistance. Check the contents of the crate against the packing list on page 6. Make
sure there are no missing items.

6.2 Unpacking

Remove the packing materials and braces. Use a safe material-handling device to lift the machine off
the skid. The machine weighs over 250 lbs. Note that the installation location must have a 115 VAC
wall outlet nearby.

6.3 Leveling

Once positioned, level the machine to the floor by turning one or more of the four levelers to the floor.
Turning a leveler clockwise moves it to the floor.
Figure 3 - Leveling

6.4 Cleaning

It may be necessary to clean the machine after installation. It may be cleaned with a solution of dish
soap and water. Do not use petroleum or acid based solvents to clean the machine. Damage may
result.

6.5 Power Hook-up (SCM only)

Insert the power plug into nearby wall outlet. The machine should operate on a 20 Amp circuit. If the
pump motor stalls or operates sluggishly, test the line voltage. To many machines on one circuit will
reduce the voltage to each, affecting their performance.

6.6 Knife and Die Installation

Go to Section 7.5 Knife and Die Change on page 14.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mscm

Table of Contents