Installation & Setup; Inspecting Shipment; Uncrating; Cleaning - Challenge iJOG Instructions And Parts Manual

Paper joggers
Table of Contents

Advertisement

5.0 Installation & Setup
5.0 Installation & Setup

5.1 Inspecting Shipment

This machine has been carefully packed to prevent damage during shipment. However, claims for
damage or loss are the responsibility of the recipient. Inspect all shipments as soon as they are
received. If there is any noticeable damage, note it on the freight bill. Visual and/or hidden damage
must be reported to the claims department of the carrier within 15 days. Contact your dealer if you
need any assistance. Check the contents of the box against the packing list on page 7. Make sure
there are no missing items.

5.2 Uncrating

The iJOG weighs approximately 70 lbs (26 kg). DO NOT risk personal injury or damage by
attempting to move machinery with makeshift equipment or inadequate help. This machine is
shipped in a corrugated carton. Open the lid and remove the fillers. Carefully lift machine out of the
carton and set on a work surface or optional stand (see section 5.5 Mounting to Adjustable Stand).

5.3 Cleaning

After unpacking, wipe down all machine panels and surfaces with a clean cloth.

5.4 Power Hook-Up

SHOCK HAZARD! Possible shock could cause personal injury or death.
Connect the plug to any standard 120 Volt outlet.
Figure 2 – Power Hook-Up

5.5 Mounting to Adjustable Stand (Optional)

Remove the stand and casters from their box. Assemble the casters to the stand using a ¾" wrench.
Assemble the tube and adjust it to you preferred height. Lock it in place using the two ½-13 bolts
(3/4" wrench) and ½" lock washers provided
Using at least two people, place the machine on the stand. Line up four holes in the top shelf of the
stand with four holes on the underside of the machine base. Fasten the machine to the stand using
four 5/16-18 screws (1/2" wrench) provided with the stand.
9

Advertisement

Table of Contents
loading

Table of Contents