DK2 Power OPC505AE Assembly Manual

5 inch auto feed chipper
Hide thumbs Also See for OPC505AE:
Table of Contents

Advertisement

OPC505AE
5 INCH AUTO FEED CHIPPER
AUTO FEED • D.O.T. TOWABLE • KOHLER ENGINE
ASSEMBLY GUIDE
DK2 USA WEST
DK2 CORPORATE HEAD OFFICE
DK2 USA EAST
4301 S VALLEY VIEW BLVD.
5330 MAINWAY
3750 SOUTH AVENUE,
SUITE 10-11 LAS VEGAS, NEVADA
BURLINGTON, ONTARIO
NORTH UNIT TOLEDO, OHIO
89103 USA
L7L6A4 CANADA
43615 USA
PARTS AND SERVICE 702-331-5353 | WWW.DK2POWER.COM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OPC505AE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for DK2 Power OPC505AE

  • Page 1 OPC505AE 5 INCH AUTO FEED CHIPPER AUTO FEED • D.O.T. TOWABLE • KOHLER ENGINE ASSEMBLY GUIDE DK2 USA WEST DK2 CORPORATE HEAD OFFICE DK2 USA EAST 4301 S VALLEY VIEW BLVD. 5330 MAINWAY 3750 SOUTH AVENUE, SUITE 10-11 LAS VEGAS, NEVADA...
  • Page 2: Table Of Contents

    WARRANTY ..................15 2 | OPC505AE man. v.210330...
  • Page 3 SECTION I ASSEMBLY...
  • Page 4: Section I: Assembly

    Connect the wiring as shown. NOTE: UPON INSPECTION OF PARTS IF YOU FIND ANY DAMAGED OR MISSING PARTS PLEASE CALL DK2 POWER AT 702-331-5353 OR CONTACT US VIA OUR WEBSITE WWW.DK2POWER.COM WE WILL REPLACE ANY MISSING PARTS TO YOU FREE PLEASE DO NOT RETURN TO THE STORE 4 | OPC505AE man.
  • Page 5: Step 2: Installing The Roller Valve

    ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 2: INSTALLING THE ROLLER VALVE Install the roller valve under the chute. Use 2 bolt hardware included. 2 BOLTS & NUTS OPC505AE man. v.210330 | 5...
  • Page 6: Step 3: Installing The Feed Roller Speed Control

    STEP 3: INSTALLING THE FEED ROLLER SPEED CONTROL Install the feed roller speed control to the side of the chute. NOTE: TAKE CARE NOT TO DROP ANY HARDWARE INTO THE FEED CHUTE AND INTO THE CUTTING CHAMBER. 2 BOLTS & NUTS 6 | OPC505AE man. v.210330...
  • Page 7: Step 4: Installing The Chip Chute

    ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 4: INSTALLING THE CHIP CHUTE Install the chip chute. Bolt 4 places. 4 BOLTS ON BASE OPC505AE man. v.210330 | 7...
  • Page 8: Step 5: Installing The Tow Bar

    ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 5: INSTALLING THE TOW BAR Install the tow bar. Use 2 bolts and hardware provided and secure tightly. USE 2 BOLTS PROVIDED 8 | OPC505AE man. v.210330...
  • Page 9: Schematics

    ASSEMBLY SCHEMATICS OPC505AE man. v.210330 | 9...
  • Page 10: Parts List

    Short blade spacer Stop bar Rear frame Interfal rod Oil seal Rubber pad Main axle Tension pulley Oil bean cover Plate blade Flower bolt M12*85 Oil feed filter Bearing FL206 Adjustable feet Chain Pulley A dia. 90 10 | OPC505AE man. v.210330...
  • Page 11 SECTION II OPERATION...
  • Page 12: Section Ii: Operation

    ENGINE OPERATION, SAFETY, AND MAINTENANCE. YOUR UNIT HAS A COMMERCIAL KOHLER ENGINE WITH A 3 YEAR PARTS AND SERVICE WARRANTY. FOR WARRANTY IN YOUR AREA, CONTACT YOUR NEAREST KOHLER DEALER. VISIT WWW.KOHLERENGINES.COM FOR PARTS, SERVICE, MANUALS, AND DEALER LOCATIONS. 12 | OPC505AE man. v.210330...
  • Page 13: Before Starting The Engine

    WEAR SAFETY GLASSES, GLOVES AND PROTECTIVE SHOES. • OPERATE OUTDOORS ONLY - GAS FUMES ARE DEADLY INDOORS. RUN ENGINE AT FULL RPM. ALLOW MACHINE TO REGAIN RPM BETWEEN CHIPPING AND NEVER DISCONNECT SAFETY SWITCHES OR RUN WITH COVERS OPEN. OPC505AE man. v.210330 | 13...
  • Page 15: Warranty

    PROCEDURE FOR OUTDOOR POWER EQUIPMENT WARRANTY Within one (1) year warranty period, the purchaser of the product can CALL 702-331-5353 DK2 POWER or contact us on www.DK2Power.com Notify us of the claimed defect and provide proof of original purchase. At this time the validity of the claim will be determined, and if approved replacement parts will be issued.
  • Page 16 This page is left blank intentionally.
  • Page 17 OPC505AE DÉCHIQUETEUSE À ALIMENTATION AU- TOMATIQUE DE 5 POUCES ALIMENTATION AUTOMATIQUE • REMORQUABLE • MOTEUR KOHLER GUIDE DE MONTAGE DK2 USA OUEST SIÈGE SOCIAL CORPORATIF DK2 DK2 USA EST 4301 S VALLEY VIEW BLVD. 5330 MAINWAY 3750 AVENUE SUD, SUITE 10-11 LAS VEGAS, NEVADA BURLINGTON, ONTARIO UNITÉ...
  • Page 18 GARANTIE ..................31 18 | OPC505AE man. v.210330...
  • Page 19 SECTION I ASSEMBLAGE...
  • Page 20: Étape 1: Déballer Tous Les Articles

    Connectez le câblage comme indiqué. REMARQUE: LORS DE L’INSPECTION DES PIÈCES SI VOUS TROUVEZ DES PIÈCES ENDOMMAGÉES OU MANQUANTES, VEUILLEZ APPELER DK2 POWER AU 702-331- 5353 OU CONTACTEZ-NOUS VIA NOTRE SITE WEB WWW.DK2POWER.COM NOUS VOUS REMPLACERONS GRATUITEMENT TOUTES LES PIÈCES MANQUANTES VEUILLEZ NE PAS RETOURNER AU MAGASIN 20 | OPC505AE man.
  • Page 21: Étape 2: Installation De La Valve De Rouleau D'alimentation

    ASSEMBLAGE INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 2: INSTALLATION DE LA VALVE DE ROULEAUX D’ALIMENTATION Installez la valve du rouleau d’alimentation sous la trémie. Utilisez les 2 boulons inclus. 2 BOULONS ET ÉCROUS OPC505AE man. v.210330 | 21...
  • Page 22: Étape 3: Installation Du Contrôle De Vitesse Du Rouleau D'alimentation

    Installez la commande de vitesse du rouleau d’alimentation sur le côté de la trémie. REMARQUE: VEILLEZ À NE PAS FAIRE CHUTER DE MATÉRIEL DANS LA CHUTE D’ALIMENTATION ET DANS LA CHAMBRE DE COUPE. 2 BOULONS ET ÉCROUS 22 | OPC505AE man. v.210330...
  • Page 23: Étape 4: Installation De La Goulotte

    ASSEMBLAGE INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 4: INSTALLATION DE LA GOULOTTE Installez la goulotte à copeaux. Boulonner les quatre (4) boulons dans leurs emplacements. 4 BOULONS SUR LA BASE OPC505AE man. v.210330 | 23...
  • Page 24: Étape 5: Installation De La Barre De Remorquage

    ASSEMBLAGE INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 5: INSTALLATION DE LA BARRE DE REMORQUAGE Installez la barre de remorquage. Utilisez les 2 boulons et le matériel fournis et fixez-les fermement. UTILISER 2 BOULONS FOURNIS 24 | OPC505AE man. v.210330...
  • Page 25: Schématique

    ASSEMBLAGE SCHÉMATIQUE OPC505AE man. v.210330 | 25...
  • Page 26: Liste Des Pièces

    Cadre arrière Tige Joint d’étanchéité Coussinet en caoutchouc Essieu principal Poulie de tension Couverture d’huile Lame de plaque Boulon M12 x 85 Filtre d’alimentation en huile Roulement à billes FL206 Pieds Chaîne Poulie A dia. 9 26 | OPC505AE man. v.210330...
  • Page 27 SECTION II OPÉRATION...
  • Page 28: Section Ii: Opération

    VOTRE APPAREIL A UN MOTEUR COMMERCIAL KOHLER AVEC UNE GARANTIE DE 3 ANS SUR LES PIÈCES ET LE SERVICE. POUR UNE GARANTIE DANS VOTRE ZONE, CONTACTEZ VOTRE REVENDEUR KOHLER LE PLUS PROCHE. VISITEZ WWW.KOHLERENGINES.COM POUR LES PIÈCES, LE SERVICE, LES MANUELS ET LES EMPLACEMENTS DES REVENDEURS. 28 | OPC505AE man. v.210330...
  • Page 29: Avant De Démarrer Le Moteur

    CARBONE SONT MORTELLES À L’INTÉRIEUR. FAIRE FONCTIONNER LE MOTEUR À PLEIN RÉGIME. LAISSEZ LA MACHINE REPRENDRE SA VITESSE ENTRE LES DÉCHIQUETAGES ET NE JAMAIS DÉBRANCHER LES INTERRUPTEURS DE SÉCURITÉ OU FAIRE FONCTIONNER AVEC LES COUVERCLES OUVERTS. OPC505AE man. v.210330 | 29...
  • Page 31: Garantie

    PROCÉDURE POUR LA GARANTIE DE L’ÉQUIPEMENT DE PRODUITS D’EXTÉRIEUR Dans un délai d’un (1) an de garantie, l’acheteur du produit peut APPELER le 702-331-5353 DK2 POWER ou nous contacter sur www.DK2Power.com Nous notifier le défaut allégué et fournir une preuve d’achat d’origine. À ce moment, la validité...

Table of Contents