Table of Contents

Advertisement

11.8. Pump down

• To enable pump down operation, at outdoor PCB, set the DS1 to OFF position.
• Press Test Run button for 1 second.
• During Pump Down operation, push the Test Run button again for 1 second to stop the pump down operation.
• The pump down operation run for 10 minutes.
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-pc30ekfCs-pc36ekfCu-pc36ekf

Table of Contents