3. For the embedded piping
Install accessory of tube ass'y
1. Remove chassis back particular piece.
2. Connect tube ass'y
piping need to pull out to joint tube ass'y.
to gas side piping. Liquid side
3. Set the piping direction.
(For bottom piping, need to perform cutting and flaring
process.)
4. Use 2 spanner to tighten the nut. (tighten torque 65 N
5. Check gas leak at joint area using tube connector
connect to liquid side piping. (Refer indication label at
chassis back for detail)
6. Cover the open tubing with the foam and bind it by
band
.
7. Close back the chassis back piece.
24
m)
●
and