(Optional) Installing a LAN Switch
4.7
1. Install guide rails and floating nuts.
2. Secure the LAN switch.
3. Connect the power cable of the
LAN switch.
4. Connect any port from 1 to 24 on
the LAN switch to the WAN1 port
on the ECC800 using a network
cable.
5. Insert a power module into the
power slot of the LAN switch.
It is recommended that the LAN switch be installed at the 36 U position of the cabinet. You can
adjust the position based on site requirements.
(Optional) Installing an IVS1800
4.8
It is recommended that the IVS1800 be installed at the 30–31 U position of the cabinet. You
can adjust the position based on site requirements.
1. Install hard disks.
a. Loosen the screws and remove the upper cover of the chassis.
b. Remove the two black screws on both sides of the chassis and the silver white screw in
the middle of the hard disk tray, rotate the hard disk tray by 45 degrees, and remove the
upper and lower layers of the hard disk tray.