Install The Electric Control Box - Launch TLT235SBA User Manual

Electronic two post lift
Table of Contents

Advertisement

LAUNCH

10.2.9 Install the electric control box

Use M5x12 Screw and washer to fix the electric
control box casing onto the column.(Fig.12)
Connect the electrical wiring as shown in Fig. 12.
Install the bottom case of the electric control box.
Note:
This equipment needs NFB (non-fuse breaker) upon
installation. This equipment does not include it. It
Wiring diagram
TLT235SBA
TLT235SBA
are shown in Fig13a.
(C) Diagtools; www.diagtools.eu; diagtools@diagtools.lv; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069
Fig 12
E
) 、
TLT240SBA models
Electronic
should be bought and installed by users. The NFB is
16A.
The power cable is required to be greater
than 2.5mm
2.
Coat the roller and carriage passage with the
lubrication grease. Raise and lower the carriages
twice without load t o see if they work well.
After the column is fixed, operate with load
Installation schematic diagram of electric control box
M4*6 Screw
TLT240SCA
TLT235SCA
Fig13b.
28
Two-post User's Manual
U
m odels are shown in

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlt240sbaTlt235sbaeTlt240scaTlt235scau

Table of Contents