Install The Power Side Column - Launch TLT235 User Manual

Economical two post lift
Table of Contents

Advertisement

Launch
1#
B
C
228mm
(8.98in)
Note:
All the dimensions are based on the external
border of the base plate.
Ensure the overall error is controlled within 6mm.
In this way, the difficulties in the final assembly,
or early wear or non-alignment of the chain can
be eliminated. The marking and layout is very
important. If it is inaccurate, there will be
problems during the final assembly and
operation.
TLT235、TLT240 Economical Two-post User's Manual
A
3563mm(140.28in)
3107mm(122.32in)
Fig.10b

10.2.3 Install the power side column

For clear-floor two post lift ,first install extension
column with column, then use lifting equipment to
place power side column upper right to the location.
Align the base plate of column with the chalk line
layout. Guided by holes on the base plate of the
column, use 5 concrete anchor bolts to fix it onto the
ground. Drill and install anchor Bolt s at one time,
during the drilling process, ensure no movement of the
column.(Fig.11a) .
Fig.11a
18
2#
D
E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlt240L-235sb

Table of Contents