Note:
The two steel cables are required to adjust
to certain uniform tension to ensure the two
carriages move synchronously.
Short Screw must be installed in the way
as shown in above Fig. The tightened
double nuts are nonadjustable otherwise it
will affect the safety use of lift.
Before operating the lift, re-check the
balancing steel cables and ensure they are
not intersected or wrongly installed. Ensure
the steel cables are still in the pulley.

10.2.7 Install the power unit and hydraulic lines

Use two M10 Bolt s and washers to fix the power unit
as shown in Fig. 10a, for TLT235SBA
(C) Diagtools; www.diagtools.eu; diagtools@diagtools.lv; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069
as shown in Fig. 10a , for TLT240SCA
Fig. 10b and tighten all the fittings to prevent oil
leakage.
Fill the reservoir with hydraulic oil (oil capacity of 10L).
Operate carefully to avoid dust and other pollutants
mixed with the hydraulic oil
Note
T LT235SBA
Fig 10a
26
Electronic
Two-post User's Manual
E
T LT240SBA models, install the hydraulic line
) 、
U
m odels, , install the hydraulic line as shown in
.
: : : :
Clean the impurities in the hydraulic line
and remove the protective plug from the
hydraulic cylinder.
When the hydraulic hose installation needs
to go through the column, ensure the
hydraulic hose won't touch any movable
parts inside the column
T LT235SCA