Install The Power Side Column - Launch TLT235SBA User Manual

Electronic two post lift
Table of Contents

Advertisement

LAUNCH
Note:
All the dimensions are based on the external
border of the base plate.
Ensure the overall error is controlled within 6mm.
In this way, the difficulties in the final assembly,
or early wear or non-alignment of the chain can
be eliminated. The marking and layout is very
important. If it is inaccurate, there will be
problems during the final assembly and
operation.
TLT235SBA
( ( ( (
E
) ) ) )
M odel
Place the big base plate and side brackets to
pre-calculated position. Use lifting equipment to place
columns at pre-calculated position and fix them by
using standard installation parts,. Guided by holes on
the big base plate and side brackets, use 12 concrete
anchor Bolt s to fix it onto the ground. Drill and install
(C) Diagtools; www.diagtools.eu; diagtools@diagtools.lv; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069
Electronic

10.2.3 Install the power side column

TLT235SBA
、 、 、 、
T LT240SBA Models
First use lifting equipment to put the power side
column upper right to the location. Align the base plate of
column with the chalk line layout.Guided by holes on the
base plate of the column, use 5 concrete anchor Bolt s to
fix it onto the ground. Drill and install anchor Bolt s at one
time, during the drilling process, ensure no movement of
the column from the chalk line (Fig.8a).
Fig. 8a
anchor Bolt s at one time, during the drilling process,
ensure no movement of big base plate and side
brackets, as shown in 10b.Insert appropriate shims
under big base plate and side brackets ,to plumb
columns and make sure no inclination would be more
than 3mm.
21
Two-post User's Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlt240sbaTlt235sbaeTlt240scaTlt235scau

Table of Contents