Launch TLT235SBA User Manual page 26

Electronic two post lift
Table of Contents

Advertisement

LAUNCH
TLT235SBA
( ( ( (
E
) ) ) )
M odel
corrugated steel plate are connected by fasteners.(as
TLT240SCA Model : : : :
Base plate symmetric installation is as shown in 7c
With total width (A) as the basis, draw two parallel
lines (#1 and #2) on the concrete slab, with the error
within 3mm. Determine the power side column
1 #
7 0 m m ( 2 . 8 i n )
)
n
i
7
.
B
5
1
(
m
m
0
0
4
Base plate asymmetric installation is based on a total width
(A) shown in 7c
draw two parallel lines (#1 and #2) on the
2,
concrete slab, with the error within 3mm.Determine a point
B at any point on chalk line #1, based on point B, move
(C) Diagtools; www.diagtools.eu; diagtools@diagtools.lv; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069
T he Base plate and four pieces
对 角 线 3 4 4 3 m m ( 1 3 5 . 6 i
Electronic
shown in Fig.7b)
Fig.7b
location on any chalk line, and mark the total width (B)
of the base plate. Mark the points 3 and 4. Starting
1:
from point 3, draw one diagonal line (C) , forming a
triangle. In this way, the vertical lines can determine
the location of the two columns.
A
3 4 2 0 m m ( 1 3 4 . 6 i n )
2 6 1 0 m m ( 1 0 2 . 8 i n )
C
n )
Diagonal 3443mm (135.6in)
2 8 2 0 m m ( 1 1 1 i n )
Fig.7c
1
down 131mm, then move right 228mm to get point C.
Based on point B, draw #1's vertical line M with a length of
A to get point D .Based on point C, draw line M's parallel
line N with a length of L to get point E. With four points
B,C,D,E, each post's position can be decided.
19
Two-post User's Manual
2 #
3
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlt240sbaTlt235sbaeTlt240scaTlt235scau

Table of Contents