Huawei FusionModule1000A40 Quick Installation Manual

Huawei FusionModule1000A40 Quick Installation Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:

Advertisement

Quick Links

FusionModule1000A40 Prefabricated All-in-One Data
Center
Quick Installation Guide (2019, UAE,
Apollo-II)
Issue
01
Date
2019-04-29
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei FusionModule1000A40

  • Page 1 FusionModule1000A40 Prefabricated All-in-One Data Center Quick Installation Guide (2019, UAE, Apollo-II) Issue Date 2019-04-29 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: Intended Audience

    Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. Issue 01 (2019-04-29) Copyright © Huawei Technologies Co., Ltd.
  • Page 4: Change History

    Change History Changes between document issues are cumulative. The latest document issue contains all updates made in previous issues. Issue 01 (2019-04-29) This issue is the first official release. Issue 01 (2019-04-29) Copyright © Huawei Technologies Co., Ltd.
  • Page 5 FusionModule1000A40 Prefabricated All-in-One Data Center Quick Installation Guide (2019, UAE, Apollo-II) Contents Contents Quick Installation Guide ....................... ii 1 Quick Installation Guide Usage ....................1 2 Installation Drawings and Parameters ..................3 Issue 01 (2019-04-29) Copyright © Huawei Technologies Co., Ltd.
  • Page 6 Parameter Manual (2019, UAE, each system. Apollo-II) Provides some parameters required during the commissioning. Provides the product configurations and parameters required during the operation and maintenance Issue 01 (2019-04-29) Copyright © Huawei Technologies Co., Ltd.
  • Page 7 Center V200R003 Installation Guide FusionModule1000A40 Describes how to perform the power-on Prefabricated All-in-One Data commissioning. Center V200R003 Commissioning Guide FusionModule1000A40 Describes how to perform the O&M. Prefabricated All-in-One Data Center V200R003 Maintenance Guide Issue 01 (2019-04-29) Copyright © Huawei Technologies Co., Ltd.
  • Page 8 FusionModule1000A40 Prefabricated All-in-One Data Center Quick Installation Guide (2019, UAE, Apollo-II) 2 Installation Drawings and Parameters Installation Drawings and Parameters Issue 01 (2019-04-29) Copyright © Huawei Technologies Co., Ltd.
  • Page 9 Checklist of Devices Installed Onsite Installation Sequence Subcategory Item Corresponding Chapter in Installation Guide Diagram ID Diagram Name Installing Pre-fab. Module Bases Installing Pre-fab. Module Bases Installing Pre-fab. Modules (Base NO.S002 Site Space and Pre-fab. Module Installation Position Diagram (Single-capacity Solution) Removing the Pre-fab.
  • Page 10 NO.S002 Site Space and Pre-fab. Module Installation Position Diagram (Single-capacity Base Scenario) Single-capacity base (height: 300) Concrete platform Ground...
  • Page 11 NO.S003 Pre-fab. Module Grounding Position Diagram...
  • Page 12 NO.S005 External Cable Tray Installation Position Diagram...
  • Page 13 NO.S006 Fire Hammer Installation Position Diagram...
  • Page 14 NO.S007 FIG rain eave mounting position...
  • Page 15 NO.S004 Pre-fab. Module Pipe Installation Position Diagram Pipe window...
  • Page 16 NO.C004 Air conditioning unit communications cable port schematic Air Conditioner Indoor Unit Wiring Port Layout Diagram Air Conditioner Outdoor Unit Wiring Port Layout Diagram Air conditioner model: 42 kW NetCol5000-A042 Technical requirements: 1. The signal cable between indoor and outdoor units is an RS485 Technical requirements: communications cable.
  • Page 17 NO.M004 Monitoring Device Installation Position Diagram Install the pad onsite. DOOR Signal window Install the WiFi Converter onsite.
  • Page 18 NO.F004 Fire Extinguishing Device Installation Position Diagram (CE) Install the extinguishant control panel batteries onsite. Install the gas cylinder onsite. Install the electrical actuator onsite. Install the external horn strobe onsite.
  • Page 19 NO.P008 Wiring Diagram from the Mains to the Power PDB Mains input D.G. input Cable Relation Table Terminal Relation Table Container Window Terminal Spec From Terminal Spec From Huawei Part Description Cable NO. Container From Device Container To Device Breaker Huawei Part Code...
  • Page 20 NO.P009 Battery Wiring Diagram 40 batteries UPS+ UPSN UPS- Battery Cabinet-1 1QF Battery Cabinet-2 BAT+ BAT N BAT- Material Quantit Code Specifications Purpose Name Battery, VRLA battery, 12V, 100Ah, 12V monomer, 330mm (width) * 174mm (depth) * 40pcs Battery 24022490 UPS dedicated battery 222mm (height), 1, Shuangdeng 6-GFM-100, UPS dedicated battery...