FusionModule1000A40 Prefabricated All-in-One Data Center Quick Installation Guide (2019, UAE, Apollo-II) Issue Date 2019-04-29 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Page 9
Checklist of Devices Installed Onsite Installation Sequence Subcategory Item Corresponding Chapter in Installation Guide Diagram ID Diagram Name Installing Pre-fab. Module Bases Installing Pre-fab. Module Bases Installing Pre-fab. Modules (Base NO.S002 Site Space and Pre-fab. Module Installation Position Diagram (Single-capacity Solution) Removing the Pre-fab.
Page 10
NO.S002 Site Space and Pre-fab. Module Installation Position Diagram (Single-capacity Base Scenario) Single-capacity base (height: 300) Concrete platform Ground...
Page 11
NO.S003 Pre-fab. Module Grounding Position Diagram...
Page 12
NO.S005 External Cable Tray Installation Position Diagram...
Page 13
NO.S006 Fire Hammer Installation Position Diagram...
Page 16
NO.C004 Air conditioning unit communications cable port schematic Air Conditioner Indoor Unit Wiring Port Layout Diagram Air Conditioner Outdoor Unit Wiring Port Layout Diagram Air conditioner model: 42 kW NetCol5000-A042 Technical requirements: 1. The signal cable between indoor and outdoor units is an RS485 Technical requirements: communications cable.
Page 17
NO.M004 Monitoring Device Installation Position Diagram Install the pad onsite. DOOR Signal window Install the WiFi Converter onsite.
Page 18
NO.F004 Fire Extinguishing Device Installation Position Diagram (CE) Install the extinguishant control panel batteries onsite. Install the gas cylinder onsite. Install the electrical actuator onsite. Install the external horn strobe onsite.
Page 19
NO.P008 Wiring Diagram from the Mains to the Power PDB Mains input D.G. input Cable Relation Table Terminal Relation Table Container Window Terminal Spec From Terminal Spec From Huawei Part Description Cable NO. Container From Device Container To Device Breaker Huawei Part Code...