MANDÍK CPV Installation, commissioning, and maintenance
Operation of the electric heaters:
ATTENTION: The heater must not be switched on until the fan is running!
Airflow through the heater is required at all times, and therefore start the fan and then wait
for its warm-up period until it reaches its normal working point. The heater may only be
switched on once such state is achieved. The fan must also run for a minimum of five minutes
after the heater has switched off to ensure the heating elements are cooled sufficiently. The
manufacturer has no liability for any damage caused by the heat build-up in the electric
heater elements due to the failure to comply with these conditions.
The standard electric heater may not be installed in an area with an explosion hazard, and no
explosive or easily combustible substances may be stored in close proximity to an electric
heater.