Mandik CPV Installation, Commissioning And Maintenance page 34

Compact air handling units
Table of Contents

Advertisement

MANDÍK CPV Installation, commissioning, and maintenance
Inspection action
7.
EVAPORATOR
Inspection for damage to heat exchange
7.01.
surfaces on the heat exchanger.
Inspection for cleanliness of heat exchange
7.02.
surfaces on the heat exchanger.
Inspection of the condition and cleanliness of
7.03.
the condensate drip eliminator
Comprehensive inspection of the condition and
function of the refrigeration circuit (leaks,
expansion valve, condenser unit, refrigerant
7.04.
level, etc.) to be conducted by a qualified
refrigeration technician certified for work with
refrigerants
Inspection of the cleanliness and continuity of
7.05.
the condensate drain.
Inspection of the status and pouring water in
7.06.
the condensate drain trap
* unit in operation when performing this inspection
Inspection action
8.
PLATE RECUPERATOR
Inspection for damage to heat exchange
8.01.
surfaces on the heat exchanger.
Inspection for cleanliness of heat exchange
8.02.
surfaces on the heat exchanger.
Inspection for free rotation of the by-pass /
8.03.
mixing dampers.
Inspection for damper fouling.
8.04.
Inspection of the condition and cleanliness of
8.05.
the condensate drip eliminator
Inspection of the cleanliness and continuity of
8.06.
the condensate drain.
Inspection of the status and pouring water in
8.07.
the condensate drain trap
* unit in operation when performing this inspection
IZU 06/2021
MAINTENANCE AND SERVICE ACTIVITIES
Unit in
operation
Y / N *
N
N
N
N
N
N
Unit in
operatio
n Y / N *
MANDÍK, a.s., www.mandik.cz
Method of service
/ removal
1
repair / replace
clean
repair / clean
repair / replace
clean / repair
repair
Method of service
/ removal
1
N
repair / replace
N
clean
N
repair / replace
N
clean
N
repair / clean
N
clean / repair
N
repair
Intervals (months)
3
6
12
Intervals (months)
3
6
12
34
R

Advertisement

Table of Contents
loading

Table of Contents