Mandik CPV Installation, Commissioning And Maintenance page 33

Compact air handling units
Table of Contents

Advertisement

MANDÍK CPV Installation, commissioning, and maintenance
Check operation
5. ELECTRIC HEATER
Check the heating rods for damage.
5.01.
Check the cleanness of the terminal board.
5.02.
Check the heating rods for cleanness.
5.03.
Check the condition of the wiring of the heating rods and
5.04.
protection (condition and tightening of the cables, etc.).
Check the function of the operating and safety
5.05.
thermostats.
* status of unit operation while performing the checks
6.
COLD WATER COIL
Inspection for damage to heat exchange surfaces
6.01.
on the heat exchanger.
Inspection for cleanliness of heat exchange
6.02.
surfaces on the heat exchanger.
Inspection for leaks on the working media side of
6.03.
the coil.
Inspection of the condition and cleanliness of the
6.04.
condensate drip eliminator
Inspection of hydraulic system connections to the
6.05.
coil.
Inspection of the condition and function of the
6.06.
mixing loop per the manufacturer's instructions.
Inspection of the cleanliness and continuity of the
6.07.
condensate drain.
Inspection of the status and pouring water in the
6.08.
condensate drain trap
* unit in operation when performing this inspection
IZU 06/2021
SERVICING AND MAINTENANCE OPERATIONS
operation
MANDÍK, a.s., www.mandik.cz
Unit in
Service/rectificati
on method
Y/N *
N
replacement
N
cleaning
N
cleaning
N
repair
value from the
N
measuring and
control system
N
repair / replace
N
clean
N
repair
N
repair / clean
N
repair
N
repair
N
clean / repair
N
repair
Intervals (months)
1
3
6
12
33
R

Advertisement

Table of Contents
loading

Table of Contents