Packing The Product For Shipment; Disposing Of The Product - SMA MD.IO-40 Installation Manual

I/o module
Table of Contents

Advertisement

SMA Solar Technology AG
• Slightly press the second locking tab outwards using the
other hand and pull the module slightly forwards on the
lower end until the module is released from the interlock of
the locking tab.
• Remove the module from its slot by pulling it forwards.
7. Remove the swivel nut from the cable gland for the communication cable.
8. Lead the connection cable out of the two-hole cable support sleeve.
9. Lead the connection cable out of the swivel nut.
10. Close unused enclosure openings of the two-hole cable support sleeve with sealing plugs.
11. Press the cable support sleeve into the two-hole cable gland.
12. Tighten the swivel nut on the cable gland hand-tight.
13. Close the inverter and, if necessary, recommission it (see inverter manual).
7.2

Packing the Product for Shipment

• Pack the product for shipping. Use the original packaging or packaging that is suitable for the weight and size of
the product.
7.3

Disposing of the Product

• Dispose of the product in accordance with the locally applicable disposal regulations for electronic waste.
Installation manual
7 Decommissioning
1
2
MD-IO-40-IA-en-11
19

Advertisement

Table of Contents
loading

Table of Contents