Commissioning and Testing

This section provides detailed information on the following:
• Depending on the local service provider's requirements the technician may be required to

Turn-Up

Initial turn-up of the SBU ONT involves applying power and observing LEDs for status infor-
mation. To complete the turn-up of the SBU ONT, complete the following steps:
1. Plug the green UPS connector into the male connector of the UPS.
2. Check to ensure the AC, output, and battery LEDs are green and functioning. The UPS is
3. View the LEDs on the SBU ONT as they cycle through start-up diagnostics. A properly
61287723G1-5B
"Turn-Up"
(see below)
perform additional tests beyond the SBU ONT on the Customer Provided Equipment
(CPE) wiring and/or equipment. If this is the case, a power meter may be used to test the
upstream and downstream signal types for voice, data and video.
"Secure the Unit"
on page 32
"Test for POTS Line Faults"
"Provision Ethernet Interface at OLT"
now ready for normal operation.
installed SBU ONT cycles through a sequence of operations during startup and power-
up phases.
Table 9
on page 32 shows the normal LED status once the startup and power-
up sequences are complete (approximately 30 seconds).
In addition to the front panel LEDs, the SBU ONT has LEDs that are integral to the