BYD Battery-Box Premium LVS
Service Guideline and Checklist
Version 1.0
Valid for Premium LVS 4.0 / 8.0 / 12.0 / 16.0 / 20.0 / 24.0
LVS 16.0 (4 Modules + PDU - max. 64 Modules in 16 Towers per System)
Important: The installation and all other kinds of works or measurements in combination with the Battery-Box
Premium are only allowed by professional and qualified electricians.
This checklist is a shortened assistance for the Battery-Box and does not replace the original manual, which can
be found on
w ww.bydbatterybox.com
modifications; no responsibility is accepted for the accuracy of this information. Attention: Improper handling
can cause danger and damage.
Make sure to always use the latest version of this service document,
available at: www.bydbatterybox.com
/
w ww.eft-systems.de
BMU (1 x per System)
/
w ww.alpspower.com.au
. Subject to technical
Need help?
Do you have a question about the Battery-Box Premium LVS and is the answer not in the manual?
Questions and answers