Download Print this page
Steelcase IMPACT Runoff Assembly Directions
Steelcase IMPACT Runoff Assembly Directions

Steelcase IMPACT Runoff Assembly Directions

Advertisement

Quick Links

Steelcase, Inc.
Grand Rapids, MI 49501
U.S.A.
1-888-783-3522
IMPACT - Attaching a Runoff to a Credenza
Conference Runoff with a
RH Kneespace Credenza
(begin on page 4)
Tools
Assembly Directions
RH Runoff with a
LH Kneespace Credenza
(shown in this direction)
Bullet Runoff with a
Kneespace Credenza
(begin on page 4)
1/8"
(3.1 mm)
Printed in the U.S.A.
Rev. D
Y9501950

Advertisement

loading
Need help?

Need help?

Do you have a question about the IMPACT Runoff and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Steelcase IMPACT Runoff

  • Page 1 Steelcase, Inc. Grand Rapids, MI 49501 U.S.A. 1-888-783-3522 IMPACT - Attaching a Runoff to a Credenza RH Runoff with a LH Kneespace Credenza (shown in this direction) Conference Runoff with a RH Kneespace Credenza (begin on page 4) Bullet Runoff with a...
  • Page 2 #10-12 x 1.00” pan head screws BOTTOM VIEW 1.00" (25 mm) Refer to the bottom view to locate Drill pilot holes 1/2” and install (2) mounting plates on (13 mm) underside of credenza. deep Steelcase Y9501950 Rev. D Page 2 of 4...
  • Page 3 BOTTOM VIEW Steelcase Y9501950 Rev. D Page 3 of 4...
  • Page 4 BULLET OR CONFERENCE TOP Steelcase Y9501950 Rev. D Page 4 of 4...

This manual is also suitable for:

Impact credenza