Installation Instructions
Preparation & Installation
16
1
Bottom Panel Screws
2
Locking Tabs
Monsoon Connect Use, Care, and Installation Guide
4. Remove bottom panel by: 1)
Removing (2) screws from left and
right sides of bottom panel. 2)
Pulling bottom panel toward front
of liner to release from locking
tabs.
5. Secure 8" or 10" round ducting
collar to top of insert by (4) M4 x
6mm screws.
6. Vertical ducting preparation is
complete. Refer to page 14, step
4 to complete installation.
C O R E
M O N S O O N
C O N N E CT
I N S E R T
Need help?
Do you have a question about the Monsoon Connect and is the answer not in the manual?
Questions and answers
The proximity control is not turning on! Troubleshoot the problem.
Can not get the on off to illuminate