Page 1
XPAND UP Single Bench –Multiple Station- Assembly Instructions Tools Required Cordless Drill Philips bit with extension for Work Surface screws (XP-Screw-WS) 3/16 Hex drive bit for XP-Screws Measuring Tape Level Rubber Mallet For additional assembly support, refer to www.openplan.com or contact 844.OPS.OPS1...
Page 2
XPand UP – Single Bench-Multiple Station XPand Parts Used for Assembly Item Part name Part Image Item Part name Part Image Description Description XP-HA-Base, leg Legs for XP-HA- XP-HA-SCT-EC End Cap Base XP-HA-Base- Base Feet XP-HA-SCTC-XX Cable Tray cover Feet...
Page 3
XPand UP – Single Bench-Multiple Station Step 1: Prepare a large floor space to put the XPand order together. Unpack the parts and check to see if all the XPand parts are present as per the sales order pick list.
Page 4
XPand UP – Single Bench-Multiple Station Step 4: Assemble XP-HA-SCT-BKT to the HA-leg using Step 5: Assemble XP-HA-SCT-S to XP-HA-SCT-BKT using (4) ½” Self Tap screws (2) XP-screws per bracket. shown in Figure A and Figure B. Extended side of the run...
Page 5
XPand UP – Single Bench-Multiple Station Step 6: Repeat Step 2 to Step 5 to assemble another Single Station and assemble both the Stations in chain using XP-HA-SCT-18 (18” Single Cable Tray ). Assemble XP-HA-SCT-18 to the XP-HA-SCT-BKT using (2) XP-Screws.
Page 6
XPand UP – Single Bench-Multiple Station Step 8: Assemble the cable tray covers XP-HA-SCTC-XX to XP-HA- SCT-BKT using (2) XP-Screws per cable tray cover. Slide in the plastic caps, XP-HA-SCT-EC (End caps) at each end of the run and XP-HA-SCT-MC (Mid Caps) in the center of the run to cover the gaps between the cable tray covers.